Finishes Specification
| Exterior | |
|---|---|
| Roof | Steel rafters, glazed concrete tiles. Rainwater gutters to all overhanging sloping roofs Under tiles protected with foil water barrier and fibre glass insulation blanket. |
| Walls | Coloured textured cement render in crème colour. Feature walls faced with selected carved sandstone relief. |
| Courtyard Features | Paving - pre-cast concrete pavers stained to light buckskin colour with loose gravel infill between, Concrete landings, steps and structural threshold - sand wash.Planter box surrounds precast ‘Risi’ stackstone. Water feature ponds to be black slate tiles. Stepping stones to be sandwash. |
| Pool | Dark blue tiles and coping - stained concrete to match pavers. |
| Interior | |
| Ceilings | Sloping ceilings (to master bedrooms and living room) and flat ceilings generally to be 10mm plasterboard, painted. |
| Walls | Generally to be flat plaster finish painted. |
| Floors | Master bedrooms - hardwood with satin polyurethane finish.Other bedrooms, living, kitchen and passage floors off-white terrazzo. Wet area floors - glazed ceramic tile. |
| Windows and doors | Coated aluminium frames with clear glass. Cupboard / wardrobe doors to be wood frames with open louvre infill panels. Door hardware to be Lockwood satin stainless (lever type handles) Interior doors to be hollow core flush painted. |
| Bathrooms | Shower base to be ceramic tile to match floor. Shower walls - glazed ‘handmade’ tiles in crème colour. Vanity shelf - terrazzo finish Vanity cabinets prefabricated laminate and laminate finish doors and facings. International standard fittings |
| Kitchen | Cabinets to be prefabricated laminate and laminate finish doors and facing pieces. Bench tops selected polished granite. Sink to be pressed seamless stainless double bowl type with built-in drainer. Hotplates to be ceramic 4 burner with recycling extractor fan over. |
| Built-in joinery | All built in wardrobes to be solid timber and face veneer wood with hanging rails, drawer sets and shelves. Individual timber framed open louvre doors with internal micro switch activated lights. |
| Services | |
| Electrical | Dimmers to living and master bedroom primary lighting circuit. |
| Air conditioning | Wall mounted split systems. |
| I.T. | 2 x telephone lines, satellite and local aerial TV cables. |
| Waste treatment | Waste water to a central treatment tank located under the Management building carpark. |
| Common Area | |
| Driveways | Concrete with stamped cobble finish. Black oxide coloured. |
| Footpaths | In common areas concrete, coloured to match driveway |
| Landscaping | All common area landscaping to have automatic irrigation system installed |
| Lighting | Footlights both sides of driveway every 8 metres inside gate. Also included in common lighting are wall lights outside each entry gateway, at 6m c/c in public walkway areas and feature lighting outside main gate. |
| Water supply | Treated water from onsite artesian well |
| Electrical supply | Underground from public supply at road. Individual metres at each unit. |

